This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website, storing information about your account with us and helping our team to understand which sections of the website you find most interesting and useful.
Pipe Bogey
Pipe Bogey
The Pipe Bogey is designed to carry long lengths of material. For example, drainage pipes, scaffolding tube and steel sections.
The Pipe Bogey is designed to carry long lengths of material. For example, drainage pipes, scaffolding tube and steel sections.
More Information
Features:
- Designed To Carry Long Pieces Of Pipe.
- Pneumatic Tyres
,
These are the recommended PPE required for this product.

Hand Protection

Foot Protection

Hard Hat
Related Products
Hire

Large Plasterboard Trolley
Perfect for safely transporting wall boards, MDF sheets and other unwieldy difficult to carry panels our plasterboard trolleys take the fuss out of potentially bending or breaking large panels by providing a safe, easy to load movable platform. The trolley is perfectly designed to fit through standard doorways.
Hire

Sheer Legs
Simple in construction and easy to install, shear legs provide a quick and secure suspension point.
Hire

COUNTER BALANCE FLOOR CRANE 500KG CTC508
Counter balanced floor cranes are highly maneuverable; they are easily moved on castors, allowing you to work directly adjacent to walls, platforms and other obstacles. Compact and convenient, this sturdy crane is perfectly suited to circumstances where outreach is needed, and provides an overhead lifting point where none exists.
Hire

Battery Powered Stair Climber 330kg
This stair climber literally walks itself up stairs lifting the load under its own power. Powered by a sealed, rechargeable battery it will even turn corners and tackle spiral staircases.
Hire

Armorgard DR2 DuctRack
The DuctRack simplifies and promotes safe and efficient storing, moving and protecting of ducting and pipework on site.