COMING SOON – THE BOSS – ZONE 1 – (GRP) TOWER!
As part of our continued investment and expansion, Broughton Plant Hire & Sales are bringing the Boss zone 1 Glass Reinforced Polymer (GRP) tower scaffold to the market.
- Manufactured from Glass Reinforced Polymer which is non-conductive, non-sparking, non-corrosive and non-oxidising for a range of applications
- Colour coded hook – ensures the braces are easy to identify
- Improved frame design enables quick assembly
- Frame collar encapsulates the GRP tube to eliminate accidental damage during assembly and Transportation
- Frame interlocking clip is retained in the collar, thereby reducing wear and tear
- 30kg side loading as required by EN1004
- Maximum platform safe working load of 220kg
Email or call for more information:
✉️ [email protected]
📞01708 383350
🗣 Live chat – speak with a member of the team here:
https://www.broughtonplanthire.co.uk/how-to-hire/
#GRPTower #FleetInvestment #CompanyGrowth #PlantHireUK #HealthAndSafety #ConstructionPlant #ServicingPlantEquipment #LowLevelAccess #WernerCo #BoSS #Romford #BroughtonPlantHireAndSales
Related Posts
⭐⭐⭐⭐⭐Customer Review
Read More
BESA Annual Conference 2024
Read More